AIP AD 2 · OIBX
OIBX — Charts & procedures
Tunb-e-Bozorg Island / Tunb-e-Bozorg
Charts open from the official Iran AIM website — OIBK does not copy or redraw them. Use the chart valid for the date of flight, and check NOTAM and AIP Supplements.
Charts · 0
Source referenceGEN 0.4 · AIRAC AMDT 1/26 · WEF 2026-02-19
- Publisher
- Iran AIM — Civil Aviation Organization of the Islamic Republic of Iran
- Document
- AIP Islamic Republic of Iran
- Section
- GEN 0.4 — Checklist of AIP pages (chart dates)
- Retrieved
- 2026-09-24 22:41 UTC
- Licence
- © CAO.IRI / Iran Airports Company
https://ais.airport.ir/documents/452631/172209133/GEN+0.4.pdf
Procedures (AD 2.20–2.23)
Text extracted from the official AIP PDF. Tables lose their layout — open the cited page for the official presentation.
AD 2.20local traffic regulations
Source referenceOIBX AD 2.20 · p. AD 2-4 OIBX · AIRAC AMDT 4/23 · WEF 2023-11-02
- Publisher
- Iran AIM — Civil Aviation Organization of the Islamic Republic of Iran
- Document
- AIP Islamic Republic of Iran (edition incl. AIRAC AMDT 1/26)
- Section
- OIBX AD 2.20 — LOCAL TRAFFIC REGULATIONS
- Retrieved
- 2026-09-24 22:41 UTC
- Licence
- © CAO.IRI / Iran Airports Company
https://ais.airport.ir/documents/452631/172210509/OIBX.pdf#page=4
AD 2.21noise abatement procedures
Source referenceOIBX AD 2.21 · p. AD 2-4 OIBX · AIRAC AMDT 4/23 · WEF 2023-11-02
- Publisher
- Iran AIM — Civil Aviation Organization of the Islamic Republic of Iran
- Document
- AIP Islamic Republic of Iran (edition incl. AIRAC AMDT 1/26)
- Section
- OIBX AD 2.21 — NOISE ABATEMENT PROCEDURES
- Retrieved
- 2026-09-24 22:41 UTC
- Licence
- © CAO.IRI / Iran Airports Company
https://ais.airport.ir/documents/452631/172210509/OIBX.pdf#page=4
AD 2.22flight procedures
1 Horizontal visibility Landing: at least 5 KM Take off: at least 800 M 2 Ceiling 1500 FT AGL 3 Wind Flight procedures and requirements for using RWY 03/21: a) tailwind component 12 KT or less. b) crosswind component 12 KT or less. 4 Airport Flight Limitation Noncommercial operation with complex motor-powered aircraft (NCC)
Source referenceOIBX AD 2.22 · p. AD 2-5 OIBX · AIRAC AMDT 2/22 · WEF 2022-04-21
- Publisher
- Iran AIM — Civil Aviation Organization of the Islamic Republic of Iran
- Document
- AIP Islamic Republic of Iran (edition incl. AIRAC AMDT 1/26)
- Section
- OIBX AD 2.22 — FLIGHT PROCEDURES
- Retrieved
- 2026-09-24 22:41 UTC
- Licence
- © CAO.IRI / Iran Airports Company
https://ais.airport.ir/documents/452631/172210509/OIBX.pdf#page=5
AD 2.23additional information
Source referenceOIBX AD 2.23 · p. AD 2-5 OIBX · AIRAC AMDT 2/22 · WEF 2022-04-21
- Publisher
- Iran AIM — Civil Aviation Organization of the Islamic Republic of Iran
- Document
- AIP Islamic Republic of Iran (edition incl. AIRAC AMDT 1/26)
- Section
- OIBX AD 2.23 — ADDITIONAL INFORMATION
- Retrieved
- 2026-09-24 22:41 UTC
- Licence
- © CAO.IRI / Iran Airports Company
https://ais.airport.ir/documents/452631/172210509/OIBX.pdf#page=5